Machine positions
Share equipment footprints, loads and any foundations or floor interfaces.
Production floors need a coordinated approach to machinery, material flow, traffic and maintenance access.

Start with your operating model.
Coordinate design and acceptance.
Share drawings and requirements.
Share equipment footprints, loads and any foundations or floor interfaces.
Plan movement routes, turning areas and transitions around production.
Coordinate installation with access restrictions and the construction schedule.
Share the production layout, equipment loading data and access plan. Floor joints and interfaces should be reviewed before installation.
Select the construction and finish from the facility specification, loading, traffic, site conditions and operational needs. Discuss the written scope before comparing quotations.
Share available drawings, photos and current concerns. Site access and the proposed work scope need to be reviewed before recommending execution.
Share the location, floor area, drawings and required specification.